veidrodelio stiklas, išorinis veidrodelis, išgaubta, šildomas, kaire
Itemnumber: 34211063

For at se vores priser kræves det et login. Kontakt os venligst for at rekvirere et.
  • GS1E691G7A (MAZDA), GS1D691G7A (MAZDA), GS1D691G7 (MAZDA), G33C691G7A (MAZDA), G33C691G7 (MAZDA)
    MAZDA 2 (De_, Dh_) 07.07-06.15

    Engine Production period KW HP Engine code From To
    1.30 10.07-06.15 55 75 ZJ-VE, ZJ46
    1.30 10.07-06.15 63 86 ZJ-VE, ZJ46
    1.30 BiFuel 05.11-11.14 55 75 ZJ-46
    1.30 BiFuel 05.11-11.14 62 84 ZJ-46
    1.30 MZR 01.10-06.15 62 84 ZJ-VE, ZJ46
    1.40 MZR 10.07-12.10 50 68 Y407
    1.50 07.07-06.15 76 103 ZY-VE, ZY66, ZY84
    1.50 (DE5FS) 10.07-06.15 83 113 ZY66, ZY84
    1.50 MZR 06.11-06.15 75 102 ZY-VE, ZY05, ZY66
    1.60 MZ-CD 06.11-06.15 70 95 Y661, Y655
    1.60 MZ-CD 10.08-06.15 66 90 Y646, Y406
    MAZDA 6 HATCHBACK (GH) 08.07-07.13

    Engine Production period KW HP Engine code From To
    1.80 MRZ 08.07-07.13 88 120 L813, L8-DE
    2.00 MRZ 08.07-07.13 108 147 LF17, LF-VE
    2.00 MRZ-CD 08.07-10.09 103 140 RF7J
    2.00 MZR 01.10-12.12 114 155 LF-DE
    2.20 D 01.10-12.12 95 129 R2BF
    2.20 MRZ-CD 01.09-12.12 136 185 R2AA
    2.20 MRZ-CD 01.09-12.12 92 125 R2BF
    2.20 MRZ-CD 01.09-12.12 120 163 R2AA
    2.20 MZR-CD 01.10-12.12 132 180 R2AA
    2.50 MRZ 08.07-03.13 125 170 L5-VE
    MAZDA 6 KOMBI (GH) 12.07-07.13

    Engine Production period KW HP Engine code From To
    1.80 MRZ 02.08-07.13 88 120 L813, L8-DE
    2.00 MRZ 12.07-07.13 108 147 LF17, LF-VE
    2.00 MRZ-CD 12.07-12.10 103 140 RF7J
    2.00 MZR 01.10-07.13 114 155 LF-DE
    2.20 D 01.10-07.13 95 129 R2BF
    2.20 MRZ-CD 01.10-07.13 132 180 R2AA
    2.20 MRZ-CD 01.09-12.10 92 125 R2BF
    2.20 MRZ-CD 08.08-12.11 136 185 R2AA
    2.20 MRZ-CD 08.08-07.13 120 163 R2AA
    2.50 MRZ 02.08-07.13 125 170 L5-VE
    MAZDA 6 NOTCHBACK (GH) 08.07-12.13

    Engine Production period KW HP Engine code From To
    1.80 MRZ 08.07-07.13 88 120 L813, L8-DE
    2.00 MRZ 08.07-12.12 108 147 LF-VE, LF4J, LF4K, LFYA, LFYB
    2.00 MRZ-CD 08.07-10.10 103 140 RF7J
    2.00 MZR 01.10-12.12 114 155 LF-DE
    2.20 D 01.10-07.13 132 180 R2AA
    2.20 D 01.10-12.12 95 129 R2BF
    2.20 MRZ-CD 01.09-12.12 92 125 R2BF
    2.20 MRZ-CD 01.09-12.12 120 163 R2AA
    2.20 MRZ-CD 01.09-12.12 136 185 R2AA
    2.50 MRZ 08.07-07.13 125 170 L5-VE